When Too Many Projects Overwhelm

Fall, fall, we all fall into fall.

I am in a snarl of too many projects and can’t seem to find my way out.

The problem with too many projects is that nothing gets done. My projects are like reflections of my moods and whichever pulls me at the moment is the one that gets worked on. But when I have a lot of projects, it starts to feel narcissistic. Or like a form of multiple personality disorder. How do I feel RIGHT NOW? What project is the perfect match for my state of mine in this genuine moment? Which garment type? This stitch complexity? That color?

And when I catch myself tangled up with indecision that granular and, frankly, insignificant, that’s when the herd gets culled. It’s for my mental health after all. I want to work on my projects, not just think about them. I want the satisfaction of finishing in a reasonable amount of time.

Here’s a pic I posted to Instagram this weekend:
A photo of knitting works-in-progress

So here’s the list of things on the needle (which I have touched in the past month; never mind the things that are already back-burnered) — clockwise from top left if you like a visual, with links to Ravelry project pages if you want more info:

  • Gift socks for the holidays. I started a new pair of socks last week. I’m trying to work on it when the recipient isn’t home. By which I mean I’m trying to not work on it when the recipient is home. Those aren’t the same things.
  • A sock sample for Washtenaw Wool Co. in our half-stripe/half speckle dye application.
  • Sockathon #2, my neverending quest to knit up scrappy socks with leftover sock yarn. I still love working on this and it’s small enough that I almost always have it with me.
  • Cowl design, long overdue, half knit up.
  • Wheaten scarf in Briar Rose Fibers Glory Days, my impulse purchase at Northern Michigan Lamb & Wool Festival. This yarn is so delicious (100% BFL) and I have been wanting to knit this pattern for a long time.
  • Susanna IC’s Yarn Crawl Mystery Knit-a-long, from August/September. I’m about halfway done. I was really enjoying this project, but had to set it aside for some deadline knitting. It’s a relatively easy knit and the yarn—old Koigu KPPPM liberated from my sister’s stash—is delicious.
  • Flax sweater in Shepherd’s Wool, started for a class I was teaching. I screwed up the sleeve garter panel and need to rip and reknit the whole thing. Sigh.
  • Thrummed mittens for a class I’m teaching, pattern of my own devising. (Not pictured; don’t know where they’re at! Somewhere in the house.)

I am harsh at this point. No matter how many projects I am considering, I always narrow the list to two, one that takes concentration and one that doesn’t. With focus, things get done quickly — sometimes even just a day or two — and then I can get back to other items on the list. Or, with the distance of time, I’ll decide something isn’t working for me and I’ll rip it out (usually precipitated because I need the needles or the storage space).

I know which two projects it needs to be.

  3 comments for “When Too Many Projects Overwhelm

  1. Charlotte
    October 6, 2016 at 11:24 am

    So, which ones get the frog treatment?

    • October 6, 2016 at 6:55 pm

      Haha! I don’t think any of these are going to get frogged. Just set aside for a bit.

  2. October 13, 2016 at 10:42 pm

    I have to do the same thing sometimes! I just cleaned out my craft room, and several partially done projects got donated to PTO Thrift in pieces because I just wasn’t feeling them anymore and needed to declutter my space.

Leave a Reply

Your email address will not be published. Required fields are marked *

%d bloggers like this: